The 1DD product provides precipitation estimates on a 1-degree grid over the entire globe at 1-day (daily) for the period October 1996 - present. Both the Pentad and 1DD products are consistent with the Version 2 monthly product in the sense that the Pentad and 1DD approximately sum to the monthly SG estimate. All three precipitation products are produced by optimally merging estimates computed from microwave, infrared, and sounder data observed by the international constellation of precipitation-related satellites, and precipitation gauge analyses.

NOTE: Due to a hardware failure, GPCP SG V2.2 and 1DD V1.2 have ceased production. The last processed month is October 2015. The follow-on GPCP V2.3 and 1DD V1.3 will soon become available, reprocessed back to January 1979 and October 1996, respectively. These new versions will be produced by at ESSIC in conjunction with NCEI (formerly NCDC).